Year: 2013 - 2014
Design / Surveying
Tyre Lighthouse Protection and Rehabilitation Works
- Submerged breakwater for coastal protection of the lighthouse (Rubble mound type, L=103m @max -4.50m MSL, crest level @max -1.00m MSL)
- Dredging works for breakwater toe @max -4.50m MSL
- Removal of existing concrete structure (light) and building a new RC one (H=12.70m)
- Rehabilitation of existing lighthouse with removal of heavily damaged parts and building new ones covering an area of 175m2
- Infrastructure (Electrical supply, pipes, manholes, lighting poles)
- Infrastructure (Water supply, Pumps, pipes, manholes, tanks)
- Sanitary infrastructure
- Topographic survey (5,600m2)
- Bathymetric survey (17,400m2)
- Tender Documents / Drawings / BoQ