Year: 2013 - 2014
Conceptual Design
LNG Terminals for Power Stations
- Sites assessment for LNG and FSRU berths for both sites, Tripoli and Zahrani Power Stations
Tripoli Site:
- Rehabilitation and armoring of the existing main breakwater at Tripoli Port (L=500m), with 9m3 concrete Accropodes blocks Type I or main detached breakwater (L=1,268m) with QR core, rocky filter layer and 20m3 concrete Accropodes blocks Type I
- Quaywall (L=400m @-15.00m) for the FSRU mooring
- Platform (21,500m2)
- LNG tanker moored (sided) along the two FSRU
- Dredging Works for a maneuvering area @-16.00m
Zahrani Site:
- Main breakwater (L=1,998m) with QR core, rocky filter layer and 20m3 concrete Accropodes blocks Type I
- Quaywall (L=400m @-15.00m) for the FSRU mooring
- Platform (21,500m2)
- LNG tanker moored (sided) along the two FSRU
- Dredging Works for a maneuvering area @-16.00m