Year: 2015 Design / Surveying / Permitting Movenpick Marina Rehabilitation Works - Main Breakwater (Rubble mound type, removal of damaged 16m3 precast concrete Accropodes blocks from the armor layer and replacement by 8 new ones) - Slabs on grade along main breakwater (Demolishing casting of 30m long) - Quaywalls (Demolition and casting of 36m long of capping beams and 142m of channels edges and covers) - Antiscourig measures (underwater concrete along 219m of quaywalls foundations @-3.00m MSL to fill cavities - Finger Pier (Replacement of 45m2 wooden deck) - Marine accessories (Mooring bollards, fenders) - Marina Fire extinguisher pipes with gate valves - Setting up of observation points system for levels - Dismantling of existing precast concrete blocks at entrance and casting of underwater concrete block @-3.00m MSL - RC capping beam at entrance with related RC wall - Monitoring in critical areas along main breakwater and quays with coordinate system and observation schedule - Topographic survey (along quaywalls) - Bathymetric survey (along quaywalls) - Underwater investigation by divers (Videos and pics) - Specifications / Drawings / BoQ / Permitting