PROJECTS
Movenpick Marina
LEBANON
PORTS / SURVEYING / PERMITTING / Middle East / Marinas /
CLIENT
Movenpick Hotel and Resort
CONSULTANT
SEATEC sarl
LOCATION
LEBANON - Beirut
33°53'0"N
35°28'22"E
Year: 2015
Design / Surveying / Permitting
Movenpick Marina Rehabilitation Works 
- Main Breakwater (Rubble mound type, removal of damaged 16m3 precast concrete Accropodes blocks from the armor layer and replacement by 8 new ones)
- Slabs on grade along main breakwater (Demolishing casting of 30m long)
- Quaywalls (Demolition and casting of 36m long of capping beams and 142m of channels edges and covers)
- Antiscourig measures (underwater concrete along 219m of quaywalls foundations @-3.00m MSL to fill cavities
- Finger Pier (Replacement of 45m2 wooden deck)
- Marine accessories (Mooring bollards, fenders)
- Marina Fire extinguisher pipes with gate valves
- Setting up of observation points system for levels
- Dismantling of existing precast concrete blocks at entrance and casting of underwater concrete block @-3.00m MSL
- RC capping beam at entrance with related RC wall
- Monitoring in critical areas along main breakwater and quays with coordinate system and observation schedule
- Topographic survey (along quaywalls)
- Bathymetric survey (along quaywalls)
- Underwater investigation by divers (Videos and pics)
- Specifications / Drawings / BoQ / Permitting

Year: 2015
Works Supervision (1st phase)
- Contractor : MARCONTRACTING
- Duration    : 1 month

Year: 2016
Works Supervision (2nd phase)
- Contractor : Khoury Contracting Company sarl (KCC)
- Duration    : 2 months

Year: 2017 - 2018 - 2023
Inspection and Audit