Year: 2016-2019
Design / Surveying
Sporting Club
- Coastal protection of platforms
- Artificial reef of 16m3 precast concrete Accropodes blocks Type I
- Underwater concrete for voids filling within existing structures
- RC seawall
- Topographic survey
- Bathymetric survey (40,000m2)
- Underwater inspection
- Drawings / BoQ / Permitting