PROJECTS
Sofim Marina
LEBANON
PORTS / SURVEYING / LIFT STRUCTURES / PERMITTING / Middle East / Marinas / Hoists /
CLIENT
SOFIM sal
CONSULTANT
SEATEC sarl
LOCATION
LEBANON - Dbayeh
33°57'16"N
35°35'34"E
Year: 2017
Design / Surveying / Permitting
Sofim Marina
- Marina Master Plan
- Berthing capacity (90 yachts)
- Main Breakwater (Rubble mound type, L=525m, core material, rocky filter and precast concrete Accropodes blocks Type I)
- Secondary Breakwater (Rubble mound type, L=200m, core material, rocky filter and rocky armor layer)
- RC crown walls
- Quaywalls (L=900m) / Precast concrete blocks (Gravity QW)
- Finger Piers (L=105m, Nbr 3) / Precast concrete elements
- Asphalted and concrete platforms
- Hoist
- Bridges
- Accessories (Bollards, fenders, lighting, water supply, fuel station...)
- Administration building, restaurants, landscape...
- Topographic survey 
- Bathymetric survey (200,000m2)
- Specifications / Drawings / BoQ
- Permitting / Decree drawing