Year: 2018
Design / Surveying
Hiran Fishing Port - Phase 1
- Main breakwater (Rubble mound type, L=174m @max -5.00m, core material, rocky filter and armour layer)
- Secondary breakwater (Rubble mound type, L=91m @max -2.00m, core material, rocky filter and armour layer)
- Dredging works of access channel and inner basin (18,135m2) up to -3.00m MSL
- Reclaimed area (17,000m2)
- Water body basin (11,500m2)
- Topographic survey (17,420m2)
- Bathymetric survey (97,600m2)
- Tender Documents / Drawings / BoQ