Year: 2022
Design / Surveying / Permitting
HOLCIM Breakwater Rehabilitation Works
- Rehabilitation works related to the damaged parts of the main breakwater L=50m @max -10.50m MSL (Rubble mound breakwater type, rocky filter and armor layer made of precast concrete Accropodes Blocks Type II / Rocky armor variant)
- Rocky toe
- Topographic survey (2,200m2)
- Bathymetric survey (64,000m2)
- Tender Documents / Drawings / Permitting
Year: 2022
Works follow up
- Contractor : STC
- Duration : 3 months