Year: 2013
Design / Surveying
Byblos Fishing Port Rehabilitation Works
- Rehabilitation of the existing and heavily damaged Main Breakwater (Rubble mound type, L=210m @max -7.00m)
- Breakwater works: core materials, rocky filter and 12, 14, 16 and 18m3 special precast concrete blocks)
- RC crown wall
- Rehabilitation of the existing and damaged secondary breakwater head at the port entrance (Vertical concrete type)
- New quaywalls (L=167m @max -3.50m MSL) / Underwater concrete blocks (Gravity QW)
- RC Platforms (1,200m2)
- RC retaining walls
- Dredging works of inner basin up (5,200m2) to -3.00m MSL for quaywalls foundation and breakwater toe
- Marine accessories (Mooring bollards)
- Infrastructure (Electrical supply, pipes, manholes, lighting poles)
- Infrastructure (Water supply, Pumps, pipes, manholes, tanks)
- Topographic survey (6,000m2)
- Bathymetric survey (65,000m2)
- Tender Documents / Drawings / BoQ