Year: 2012
Design / surveying
- Master Plan update
- Berthing capacity (520 boats)
- Sloped rocky protection of the reclaimed platforms (L=230m @max -4.00m MSL)
- Quaywalls (L=910m @-3.00m MSL) / Underwater concrete blocks (Gravity QW)
- Finger Piers (Nbr=3; L=185m @-3.00m MSL) / Precast concrete blocks
- Water Outlet for basin flushing (L=51.00m) / Precast concrete blocks
- Slipway (Boats ramp)
- Boat Hoist (100T capacity) / Precast concrete blocks (L=21.00m @-3.00m MSL)
- RC Platforms (3,395m2)
- Bituminous Platforms (34,300m2)
- Excavation works
- Dredging works of basin (31,220m2) and entrance channel up to -3.00m MSL and for quaywalls foundations and rocky protection
- RC retaining walls
- Infrastructure (Electrical supply, pipes, manholes, lighting poles)
- Infrastructure (Water supply, Pumps, pipes, manholes, tanks)
- Marine accessories (Mooring bollards)
- Fishermen rooms (Nbr=58; 1,184m2)
- Army and Ministry of agriculture rooms (Nbr=6; 185m2)
- Directorate general of land and maritime transport room (58m2)
- Fishermen syndicate building (204m2)
- Fish market (704m2)
- Stone cladding
- Waste water treatment plant
- Reclaimed platforms (52,460m2)
- Basin (31,220m2)
- Berthing capacity (520 boats)
- Topographic survey (74,800m2)
- Bathymetric survey (55,300m2)
- Tender Documents / Drawings / BoQ
Year: 2012 - 2019
Works Supervision
- Contractor : MARCONTRACTING
- Duration : 75 months