Year: 2025
Design / Surveying / Permitting
Terminal 829
- Master Plan
- Offshore pipeline (L=750m) for fuel/oil products
- Tanks for fuel/oil/gas storage
- Buildings / workshop / lab buildings in the private plot
- Offshore berth (CBM) for tankers
- Reclaimed land with rocky protection (L=220m)
- Underground passage
- Bathymetric survey (510,000m2)
- Decree for the Public maritime domain occupancy (Pipelines, tanker berth, platform…)
- Drawings / BoQ / Permitting