Year: 2026
Design
BOSCAM development at Douala Port
- Master Plan
- Total land area (475,000m2)
Container Terminal
- Quaywall (L=760m @-6.050m LAT) / Piling system
- Terminal area for containers storage (225,000m2)
- Trucks parking (17,000m2)
- Reefers area (1,620m2)
- Warehouses (1,620m2)
- Cold storage warehouses (3,350m2)
- Container freight station CFS (1,150m2)
- Workshops (400m2)
- Offices (2,400m2)
General Cargo Terminal
- Quaywall (L=700m @-6.50m LAT) / Piling system
- Terminal platform (70,000m2)
- Warehouses (29,000m2)
Ro-Ro Terminal and ferry berth
- Quaywall (L=100m @-6.50m LAT) / Piling system
- Terminal platform (6,900m2)
Parking with photovoltaic panels
- Area (29,800m2)
Offices
- Area (57,200m2)
- Offices area (21,600m2)
- Basin / entrance channel dredging (360,000m2) @-6.50m LAT.
- Specifications / Drawings / BoQ