Year: 2008
Design / Surveying
Ghazieh Coastal Protection
- Coastal protection for the industrial zone
- Sloped rocky protection (L=290m)
- Land reclamation (4,350m2)
- Infrastructure (Manholes and drainage pipes)
- Topographic survey (9,000m2)
- Bathymetric survey (225,000m2)
- Tender Documents / Drawings / BoQ
Year: 2009 - 2010
Works Supervision
- Contractor : Khoury Contracting Company sarl (KCC)
- Duration : 8 months