Hantouch Fishing Port
LEBANON
PORTS / SURVEYING / LIFT STRUCTURES / Middle East / Fishing Ports / Slipways /
CLIENT
LEBANESE REPUBLIC
Ministry of Public Works and Transport
Directorate General of Land and Maritime Transport
CONSULTANT
SEATEC sarl
LOCATION
LEBANON - Hantouch
33°51'1"N
35°28'59"E
Year: 2009
Conceptual Design / Surveying
Hantouch Fishing Port
- Master Plan
- Berthing capacity (360 boats)
- Main Breakwater (Rubble mound type, L=210m @max -6.00m MSL), with 12m3 concrete Accropodes blocks Type 1 (Armor layer)
- Quaywalls (L=220m @-2.00m) / Precast concrete blocks (Gravity QW)
- Quaywalls (L=116m @-3.00m) / Precast concrete blocks (Gravity QW)
- Quaywalls (L=142m @-4.00m) / Precast concrete blocks (Gravity QW)
- Finger Piers (L=77m @-2.00m) / Precast concrete elements with wooden top
- Finger Piers (L=56m @-3.00m) / Precast concrete elements with wooden top
- Finger Piers (L=62m @-4.00m) / Precast concrete elements with wooden top
- Marine accessories (Mooring bollards)
- Slipway (Boats ramp)
- Asphalted platforms for car parking and access roads (6,750m2)
- Concrete platforms for boats maintenance (7,750m2)
- Fishermen rooms (90m2)
- Fish market (375m2)
- Basin (13,000m2)
- Reclaimed areas (14,500m2)
- Topographic survey (10,500m2)
- Bathymetric survey (80,000m2)
- Drawings / BoQ

Year: 2010
Design
Temporary protection and dredging works
- Temporary protection of the existing natural basin using 12m3 concrete Accropodes blocks Type 1
- Basin dredging (2,500m2) @-2.00m MSL
- Tender documents / Drawings / BoQ