Year: 2011
Design / Surveying
Amchit Fishing Port - Phase 2
- Port Master Plan
- Rehabilitation of the existing and heavily damaged Main Breakwater (Rubble mound type, L=198m; max depth @-7.75m)
- Breakwater works: core materials, rocky filter and 9 and 16m3 concrete Accropodes blocks Type 1)
- RC crown wall
- Quaywalls (L=208m @ max-4.50m MSL) / Underwater concrete blocks (Gravity QW)
- Finger Piers (L=45m @ max-4.50m MSL) / Underwater concrete blocks
- RC Platforms (2,360m2)
- RC retaining walls (Hmax=3.90m)
- Excavation for inner basin widening
- Dredging works of inner basin up to -2.50m MSL, for quaywalls foundation and breakwater toe
- Marine accessories (Mooring bollards)
- Infrastructure (Electrical supply, pipes, manholes, lighting poles)
- Infrastructure (Water supply, Pumps, pipes, manholes, tanks)
- New Fishermen syndicate headquarters, rooms and fish market (98m2)
- Stone cladding
- Petrol station
- Topographic survey (5,000m2)
- Bathymetric survey (12,000m2)
- New berthing capacity (120 boats)
- Tender Documents / Specifications / Drawings / BOQ
Year: 2012 - 2015
Works Supervision
- Contractor : Khoury Contracting Company sarl (KCC)
- Duration : 34 months