Year: 2011
Hiran Fishing Port
- Master Plan
- Berthing capcity (150 boats)
- Main breakwater (Rubble mound type, L=210m @max -5.00m, core material, rocky filter and armour layer)
- Main breakwater (Underwater concrete, L=45m @max -3.00m)
- Secondary breakwater (Rubble mound type, L=75m @max -3.00m, core material, rocky filter and armour layer)
- RC crown wall
- Quaywalls (L=199m @-1.50m MSL) / Precast concrete blocks (Gravity QW)
- Quaywalls (L=124m @-3.00m MSL) / Precast concrete blocks (Gravity QW)
- Finger pier (L=48m @-1.50m MSL) / Precast concrete blocks
- Finger pier (L=48m @-3.00m MSL) / Precast concrete blocks
- Slipway (Boat ramp)
- Concrete platforms (2,545m2)
- Asphalted platforms (12,545m2)
- Dredging works of inner basin up to -1.50m MSL
- Reclaimed area (18,390m2)
- Water body basin (7,400m2)
- Drawings / BoQ