Naher el Kebir Protection
LEBANON
PORTS / COASTAL PROTECTIONS / SURVEYING / LIFT STRUCTURES / Middle East / Fishing Ports / Revetments / Slipways /
CLIENT
LEBANESE REPUBLIC
Ministry of Public Works and Transport
Directorate General of Land and Maritime Transport
CONSULTANT
SEATEC sarl
LOCATION
LEBANON - Aarida
34°38'3"N
35°58'41"E
Year: 2012
Design / Surveying
Naher el Kebir River Banks Protection
- Coastal protection for Naher el Kebir River banks against flooding
- Sloped rocky protection (L=281m @max -2.50m MSL, core material, rocky filter and armour layer)
- Land reclamation and RC slabs on grade (4,190m2)
- Slipway (Boats ramp)
- Infrastructure (Manholes and storm drainage pipes)
- Dredging for protection toe @max -4.00m MSL
- Topographic survey (9,450m2)
- Bathymetric survey (11,400m2)
- Tender Documents / Drawings / BoQ

Year: 2012 - 2013
Works Supervision
- Contractor : SOTEG sarl
- Duration    : 14 months